Labour Statement

State: Odisha District: Ganjam Block: Purushottampur Gram Panchayat: Ranajhali
Work Code: OD/354/3381/117943/412221/00017477 (CONST OF CC/PAVOR ROAD FROM LOKNATH BEHER GHARA CHAKA TO BHANDRI KOTHGURHA RANAJHALI)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Purushottampur Bill Status: Final Bill
Proposal Date: 12-10-2024 Date of Commencement: 19-05-2025
Date of Completion: 03-06-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: Pavor Block
Project Type: New Work Name of Executant: Janaki Patro
Administrative Approval Details
Approval No.: OD/354/3381/117943/412221/00017477/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3381/117943/412221/00017477/TS
Fund Sanction No.: 29143
Fund Sanction Amount (in Rs.): 538000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102a) : Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 6.0243992 Cubic Meter 0.43 2.590491656 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 106.92518745161 Cubic Meter 0.1236 13.215953169019 - - - -
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 13.465771072 Cubic Meter 4.6 61.9425469312 - - 0.68 9.15672432896
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 91.71012548 Square Meter - - 0.05 4.585506274 0.05 4.585506274
Total Qty 77.748991756219 13.74223060296 4.585506274
Rate Per Man Day 462 562 512
Total Amount 35920.034191373 7723.1335988635 2347.779212288
Total Labour Amount (in Rs.): 45990.947002525