Labour Statement

State: Odisha District: Ganjam Block: Polosara Gram Panchayat: Madhupalli
Work Code: OD/354/3380/117915/411583/00017498 (Repair & Maintenance of AWC Building at Hirapalli under Madhupalli GP)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Polosara Bill Status: Final Bill
Proposal Date: 20-07-2024 Date of Commencement: 13-05-2025
Date of Completion: 28-05-2025 Scheme Name: Asset Management Women and Child Development Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: AWC
Project Type: Repair and Maintenance Name of Executant: Sradhanta Prasad Sahu
Administrative Approval Details
Approval No.: OD/354/3380/117915/411583/00017498/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3380/117915/411583/00017498/TS
Fund Sanction No.: 45000
Fund Sanction Amount (in Rs.): 45000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled Skilled
Rs. 462 Rs. 612 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0317) : 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 40.32 Square Meter 0.36 14.5152 - - 0.1 4.032
2 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 40.32 Square Meter 0.053763440860215 2.1677419354839 - - 0.053763440860215 2.1677419354839
3 Other Building Items. (AR1902) : cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 171.3175 Square Meter 0.057 9.7650975 0.05 8.565875 - -
4 Painting (AR0918ca) : Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 83.875 Square Meter 0.11776344086022 9.8774086021505 - - 0.10776344086022 9.0386586021505
Total Qty 36.325448037634 15.238400537634 8.565875
Rate Per Man Day 462 612 562
Total Amount 16782.356993387 9325.9011290323 4814.02175
Total Labour Amount (in Rs.): 30922.279872419