Labour Statement

State: Odisha District: Balangir Block: Titlagarh Gram Panchayat: Kuskela
Work Code: OD/345/3296/116015/421450/00019253 (Const. of C.C. Road from Kuskela to Hospital Road)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Titlagarh Bill Status: Final Bill
Proposal Date: 31-12-2024 Date of Commencement: 24-08-2025
Date of Completion: 03-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Renovation or Rejuvenation Name of Executant: LOPAMUDRA BISWAL
Administrative Approval Details
Approval No.: OD/345/3296/116015/421450/00019253/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3296/116015/421450/00019253/TS
Fund Sanction No.: 31142
Fund Sanction Amount (in Rs.): 400000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 418.5 Square Meter 0.01 4.185 - - - -
2 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.05 Cubic Meter 0.516 2.0898 - - - -
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 21.6 Cubic Meter 0.1236 2.66976 - - - -
4 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 45.225 Cubic Meter 3.9 176.3775 - - 0.18 8.1405
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.925 Cubic Meter 4.6 96.255 - - 0.68 14.229
6 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 47.7 Square Meter - - 0.05 2.385 0.05 2.385
Total Qty 281.57706 24.7545 2.385
Rate Per Man Day 462 562 512
Total Amount 130088.60172 13912.029 1221.12
Total Labour Amount (in Rs.): 145221.75072