Labour Statement

State: Odisha District: Kandhamal Block: Kotagarh Gram Panchayat: Judaballi
Work Code: OD/359/3428/118948/417224/00023419 (Cc Road From Rd Road To Medical, Judabali)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Kotagarh Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 20-09-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Ramesh Chandra Das
Administrative Approval Details
Approval No.: OD/359/3428/118948/417224/00023419/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3428/118948/417224/00023419/TS
Fund Sanction No.: 1473
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.55998 Cubic Meter 0.516 2.35294968 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12.1542 Cubic Meter 0.1236 1.50225912 - - - -
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 13.9213 Cubic Meter 3.9 54.29307 - - 0.18 2.505834
4 Concrete (AR0307) : Fourth Floor - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 12.93 Cubic Meter 8.04542875 104.0273937375 - - 1.18932425 15.3779625525
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 8.62 Square Meter - - 0.05 0.431 0.05 0.431
Total Qty 162.1756725375 18.3147965525 0.431
Rate Per Man Day 462 562 512
Total Amount 74925.160712325 10292.915662505 220.672
Total Labour Amount (in Rs.): 85438.74837483