Labour Statement

State: Odisha District: Kandhamal Block: Baliguda Gram Panchayat: Sudra
Work Code: OD/359/3422/118879/416583/00026076 (IMPROVEMENT OF ROAD AT KATERIBHATTA)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Baliguda Bill Status: Final Bill
Proposal Date: 17-12-2024 Date of Commencement: 01-07-2025
Date of Completion: 10-07-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: BIJAYA KUMAR KISHAN
Administrative Approval Details
Approval No.: OD/359/3422/118879/416583/00026076/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3422/118879/416583/00026076/TS
Fund Sanction No.: 4605
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102a4) : Earthwork in hard soil or gravelly soil within 50m lead, with one extra lift - Earthwork in hard soil or gravelly soil within 50m lead, with one extra lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 4.21360780032 Cubic Meter 0.471 1.9846092739507 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.42514706816 Cubic Meter 0.1236 1.2885481776246 - - - -
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 18.04010092416 Cubic Meter 3.9 70.356393604224 - - 0.18 3.2472181663488
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 12.110529024 Cubic Meter 4.6 55.7084335104 - - 0.68 8.23515973632
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 40.134096 Square Meter - - 0.05 2.0067048 0.05 2.0067048
Total Qty 129.3379845662 13.489082702669 2.0067048
Rate Per Man Day 462 562 512
Total Amount 59754.148869584 7580.8644788999 1027.4328576
Total Labour Amount (in Rs.): 68362.446206084