Labour Statement

State: Odisha District: Koraput Block: Jeypore Gram Panchayat: Barniput
Work Code: OD/363/3470/119781/429076/00029888 (Repair and Maintenance of CC Road from RD Road to Kadamguda)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Jeypore Bill Status: Final Bill
Proposal Date: 16-12-2024 Date of Commencement: 11-08-2025
Date of Completion: 06-09-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: CHANDAN MAHARANA
Administrative Approval Details
Approval No.: OD/363/3470/119781/429076/00029888/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3470/119781/429076/00029888/TS
Fund Sanction No.: 1528
Fund Sanction Amount (in Rs.): 220000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Semi-Skilled Skilled
Rs. 462 Rs. 512 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 17.18 Cubic Meter 0.516 8.86488 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 26.97 Cubic Meter 0.1236 3.333492 - - - -
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 72 Square Meter - - 0.05 3.6 0.05 3.6
4 R.C.C. Work (AR0401) : R.C.C work - 'Reinforced cement concrete (1:2:4) work with 12mm size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (To be used for minor repair work only) 11.784 Cubic Meter 4.6 54.2064 - - 0.68 8.01312
Total Qty 66.404772 3.6 11.61312
Rate Per Man Day 462 512 562
Total Amount 30679.004664 1843.2 6526.57344
Total Labour Amount (in Rs.): 39048.778104