Labour Statement

State: Odisha District: Nabarangpur Block: Papadahandi Gram Panchayat: Pondikote
Work Code: OD/366/3519/120526/427744/00030482 (Development of Road at Kupuliguda)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Papadahandi Bill Status: Final Bill
Proposal Date: 14-05-2025 Date of Commencement: 23-09-2025
Date of Completion: 12-11-2025 Scheme Name: Chief Minister Special Assistant
Scheme Component Name: Self/Personal Deposit Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: BIPIN KUMAR TRIPATHY JE
Administrative Approval Details
Approval No.: OD/366/3519/120526/427744/00030482/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3519/120526/427744/00030482/TS
Fund Sanction No.: 3228
Fund Sanction Amount (in Rs.): 500000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 6.72 Cubic Meter 0.516 3.46752 - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 34.58 Cubic Meter 0.1236 4.274088 - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 40.18 Cubic Meter 3.9 156.702 0.18 7.2324
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 35.7 Cubic Meter 4.6 164.22 0.68 24.276
5 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 352.8 Square Meter 0.01 3.528 - -
Total Qty 332.191608 31.5084
Rate Per Man Day 462 562
Total Amount 153472.522896 17707.7208
Total Labour Amount (in Rs.): 171180.243696