Labour Statement

State: Odisha District: Kalahandi Block: Dharamagarh Gram Panchayat: Badbasul
Work Code: OD/358/3410/118594/423965/00039137 (CONSTRUCTION OF CC ROAD FROM RAURAHALDI CHARI CHOWK TO MAJHIAGHATIA CHOWK)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Dharamagarh Bill Status: Final Bill
Proposal Date: 31-05-2025 Date of Commencement: 29-07-2025
Date of Completion: 10-08-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: surya nath
Administrative Approval Details
Approval No.: OD/358/3410/118594/423965/00039137/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3410/118594/423965/00039137/TS
Fund Sanction No.: 14036
Fund Sanction Amount (in Rs.): 250000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Semi-Skilled Skilled
Rs. 462 Rs. 512 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.7975 Cubic Meter 0.516 1.44351 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 15.57258333288 Cubic Meter 0.1236 1.924771299944 - - - -
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 13.428 Square Meter - - 0.05 0.6714 0.05 0.6714
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 4.773 Cubic Meter 4.6 21.9558 - - 0.68 3.24564
Total Qty 25.324081299944 0.6714 3.91704
Rate Per Man Day 462 512 562
Total Amount 11699.725560574 343.7568 2201.37648
Total Labour Amount (in Rs.): 14244.858840574