Labour Statement

State: Odisha District: Sambalpur Block: Rairakhol Gram Panchayat: Gadgadbahal
Work Code: OD/371/3565/121403/382315/00045902 (Construction of Paver Block Road Near Shiva Mandir , Gargadbahal )
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Rairakhol Bill Status: Final Bill
Proposal Date: - Date of Commencement: 05-08-2025
Date of Completion: 06-08-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: Pavor Block
Project Type: New Work Name of Executant: Khirabdhi Tanaya Padhy
Administrative Approval Details
Approval No.: OD/371/3565/121403/382315/00045902/AS
Technical Sanction Details
Technical Sanction No.: OD/371/3565/121403/382315/00045902/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 500000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 93.315 Cubic Meter 0.516 48.15054 - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 93.315 Cubic Meter 0.1236 11.533734 - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 31.105 Cubic Meter 3.9 121.3095 0.18 5.5989
Total Qty 180.993774 5.5989
Rate Per Man Day 462 562
Total Amount 83619.123588 3146.5818
Total Labour Amount (in Rs.): 86765.705388