Labour Statement

State: Odisha District: Balasore Block: Nilgiri Gram Panchayat: Telipal
Work Code: OD/346/3305/116253/393307/00047151 (construction of Cc road from Tala bhagabandha purusottam beherahouse to nua pokhari )
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Nilgiri Bill Status: Final Bill
Proposal Date: - Date of Commencement: 08-08-2025
Date of Completion: 08-08-2025 Scheme Name: Chief Minister Special Assistant
Scheme Component Name: Special Problem Fund (SPF) 16 th Phase Project Sub-Category: CC Road
Project Type: New Work Name of Executant: MADHUSMITA MOHANTY
Administrative Approval Details
Approval No.: OD/346/3305/116253/393307/00047151/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3305/116253/393307/00047151/TS
Fund Sanction No.: 572
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Semi-Skilled Skilled
Rs. 462 Rs. 512 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 3.812573952 Cubic Meter 0.516 1.967288159232 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.708446048 Cubic Meter 0.1236 1.6943639315328 - - - -
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 24.0061352 Square Meter - - 0.05 1.20030676 0.05 1.20030676
4 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.614733024 Cubic Meter 3.9 60.8974587936 - - 0.18 2.81065194432
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.711395936 Cubic Meter 4.6 49.2724213056 - - 0.68 7.28374923648
Total Qty 113.83153218996 1.20030676 11.2947079408
Rate Per Man Day 462 512 562
Total Amount 52590.167871764 614.55706112 6347.6258627296
Total Labour Amount (in Rs.): 59552.350795613