Labour Statement

State: Odisha District: Balasore Block: Nilgiri Gram Panchayat: Jamudiha
Work Code: OD/346/3305/116240/393154/00048617 (Imp of road from RD road to ANM ventre at Jamudiha)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Nilgiri Bill Status: Final Bill
Proposal Date: - Date of Commencement: 13-08-2025
Date of Completion: 13-08-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: BAIDYANATH SINGH
Administrative Approval Details
Approval No.: OD/346/3305/116240/393154/00048617/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3305/116240/393154/00048617/TS
Fund Sanction No.: 12488
Fund Sanction Amount (in Rs.): 215000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 3.728473056 Cubic Meter 0.516 1.923892096896 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12.42824352 Cubic Meter 0.1236 1.536130899072 - - - -
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.156716576 Cubic Meter 3.9 63.0111946464 - - 0.18 2.90820898368
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.92178976 Cubic Meter 4.6 50.240232896 - - 0.68 7.4268170368
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 41.02224868 Square Meter - - 0.05 2.051112434 0.05 2.051112434
Total Qty 116.71145053837 12.38613845448 2.051112434
Rate Per Man Day 462 562 512
Total Amount 53920.690148726 6961.0098114178 1050.169566208
Total Labour Amount (in Rs.): 61931.869526352