Labour Statement

State: Odisha District: Bhadrak Block: Tihidi Gram Panchayat: Bilana
Work Code: OD/348/3328/116754/395199/00048736 (IMPROVEMENT OF ROAD FROM PATANALA TO GANDHAI ROAD AT LANJATARA)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Tihidi Bill Status: Final Bill
Proposal Date: - Date of Commencement: 01-11-2025
Date of Completion: 19-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: PEO BILANA GP
Administrative Approval Details
Approval No.: OD/348/3328/116754/395199/00048736/AS
Technical Sanction Details
Technical Sanction No.: OD/348/3328/116754/395199/00048736/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 202000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.5 Cubic Meter 0.1236 0.1854 - - - -
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 1.35 Cubic Meter 3.9 5.265 - - 0.18 0.243
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.957015 Cubic Meter 4.6 105.602269 - - 0.68 15.6107702
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 31.68 Square Meter - - 0.05 1.584 0.05 1.584
Total Qty 111.052669 17.4377702 1.584
Rate Per Man Day 462 562 512
Total Amount 51306.333078 9800.0268524 811.008
Total Labour Amount (in Rs.): 61917.3679304