Labour Statement

State: Odisha District: Angul Block: Chhendipada Gram Panchayat: Similipal
Work Code: OD/344/3279/115661/404458/00049763 (CONST OF CC ROAD FROM GP ROAD TO KHUMBESWARI PITHA SIMILIPAL)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Chhendipada Bill Status: Final Bill
Proposal Date: - Date of Commencement: 30-08-2025
Date of Completion: 15-09-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: RAJESH KUMAR SAHU
Administrative Approval Details
Approval No.: OD/344/3279/115661/404458/00049763/AS
Technical Sanction Details
Technical Sanction No.: OD/344/3279/115661/404458/00049763/TS
Fund Sanction No.: 14036
Fund Sanction Amount (in Rs.): 217956
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 5.14996508928 Cubic Meter 0.516 2.6573819860685 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.13020566528 Cubic Meter 0.1236 1.6228934202286 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 17.2874064 Cubic Meter 3.9 67.42088496 - - 0.18 3.111733152
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.101452064 Cubic Meter 4.6 46.4666794944 - - 0.68 6.86898740352
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 24.526392 Square Meter - - 0.05 1.2263196 0.05 1.2263196
Total Qty 118.1678398607 11.20704015552 1.2263196
Rate Per Man Day 462 562 512
Total Amount 54593.542015642 6298.3565674022 627.8756352
Total Labour Amount (in Rs.): 61519.774218244