Labour Statement

State: Odisha District: Kandhamal Block: Tumudibandh Gram Panchayat: Belaghar
Work Code: OD/359/3433/119010/417041/00052684 (Renovation of U.P School, Batipada)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Tumudibandh Bill Status: Final Bill
Proposal Date: 22-07-2024 Date of Commencement: 17-10-2025
Date of Completion: 15-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance of Primary School Building Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: Ram
Administrative Approval Details
Approval No.: OD/359/3433/119010/417041/00052684/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3433/119010/417041/00052684/TS
Fund Sanction No.: 5579
Fund Sanction Amount (in Rs.): 366880
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 14.87924378752 Cubic Meter 0.516 7.6776897943603 - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 7.16211725376 Cubic Meter 0.1236 0.88523769256474 - -
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 5.609062536 Cubic Meter 3.9 21.8753438904 0.18 1.00963125648
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 4.929176168 Cubic Meter 4.6 22.6742103728 0.68 3.35183979424
Total Qty 53.112481750125 4.36147105072
Rate Per Man Day 462 562
Total Amount 24537.966568558 2451.1467305046
Total Labour Amount (in Rs.): 26989.113299062