Labour Statement

State: Odisha District: Gajapati Block: Mohona Gram Panchayat: Liliguda
Work Code: OD/353/3360/275039/413849/00052699 (IMPROVEMENT OF ROAD WITH CC / GRADE-2 MEATILING FROM RD RAIPADARA AT RAIPADARA)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Mohona Bill Status: Final Bill
Proposal Date: 16-02-2024 Date of Commencement: 23-09-2025
Date of Completion: 06-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Sudipti Padhiari
Administrative Approval Details
Approval No.: OD/353/3360/275039/413849/00052699/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3360/275039/413849/00052699/TS
Fund Sanction No.: 3781
Fund Sanction Amount (in Rs.): 350000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 18.425 Cubic Meter 0.1236 2.27733 - - - -
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 25.025 Cubic Meter 3.9 97.5975 - - 0.18 4.5045
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 66 Square Meter - - 0.05 3.3 0.05 3.3
4 Earth Work (AR0103a) : Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 43.45 Cubic Meter 0.6706 29.13757 - - - -
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 15.05625 Cubic Meter 4.6 69.25875 - - 0.68 10.23825
Total Qty 198.27115 18.04275 3.3
Rate Per Man Day 462 562 512
Total Amount 91601.2713 10140.0255 1689.6
Total Labour Amount (in Rs.): 103430.8968