Labour Statement

State: Odisha District: Ganjam Block: Polosara Gram Panchayat: Bellagam
Work Code: OD/354/3380/117901/411595/00052795 (Construction of CC Road/Paver Road of Nuan Sahi at Dimiria)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Polosara Bill Status: Final Bill
Proposal Date: 30-05-2025 Date of Commencement: 19-09-2025
Date of Completion: 20-09-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: Pavor Block
Project Type: New Work Name of Executant: Sradhanta Prasad Sahu
Administrative Approval Details
Approval No.: OD/354/3380/117901/411595/00052795/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3380/117901/411595/00052795/TS
Fund Sanction No.: 3738
Fund Sanction Amount (in Rs.): 246144
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.4138 Cubic Meter 0.516 1.2455208 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.9467 Cubic Meter 0.1236 0.24061212 - - - -
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 1.81035 Cubic Meter 4.6 8.32761 - - 0.68 1.231038
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 7.772 Square Meter - - 0.05 0.3886 0.05 0.3886
Total Qty 9.81374292 1.619638 0.3886
Rate Per Man Day 462 562 512
Total Amount 4533.94922904 910.236556 198.9632
Total Labour Amount (in Rs.): 5643.14898504