Labour Statement

State: Odisha District: Koraput Block: Nandapur Gram Panchayat: Nandaka
Work Code: OD/363/3476/119883/430082/00056831 (Constrcution of paver block road at Doraguda )
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Nandapur Bill Status: Final Bill
Proposal Date: - Date of Commencement: 10-10-2025
Date of Completion: 17-10-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: Pavor Block
Project Type: New Work Name of Executant: Rajesh Kumar Khosla
Administrative Approval Details
Approval No.: OD/363/3476/119883/430082/00056831/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3476/119883/430082/00056831/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 300000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 14.8981875 Cubic Meter 0.1236 1.841415975 - -
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 21.102375 Cubic Meter 4.6 97.070925 0.68 14.349615
4 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 13.55925 Cubic Meter 0.516 6.996573 - -
Total Qty 105.908913975 14.349615
Rate Per Man Day 462 562
Total Amount 48929.91825645 8064.48363
Total Labour Amount (in Rs.): 56994.40188645