Labour Statement

State: Odisha District: Puri Block: Gop Gram Panchayat: Jangalbori
Work Code: OD/369/3539/120944/409400/00061234 (COnst. of CC road from Chhabindra Sahoo house to Akhandalmani Pitha)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Gop Bill Status: 1st Bill
Proposal Date: 03-06-2023 Date of Commencement: 22-10-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Kamalakanta Baskey
Administrative Approval Details
Approval No.: OD/369/3539/120944/409400/00061234/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3539/120944/409400/00061234/TS
Fund Sanction No.: 304836
Fund Sanction Amount (in Rs.): 304836
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 30.8369952 Cubic Meter 4.6 141.85017792 - - 0.68 20.969156736
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 21.36769 Square Meter - - 0.05 1.0683845 0.05 1.0683845
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 6.95743776 Cubic Meter 3.9 27.134007264 - - 0.18 1.2523387968
Total Qty 168.984185184 23.2898800328 1.0683845
Rate Per Man Day 462 562 512
Total Amount 78070.693555008 13088.912578434 547.012864
Total Labour Amount (in Rs.): 91706.618997442