Labour Statement

State: Odisha District: Bhadrak Block: Bhandaripokhari Gram Panchayat: Patuli
Work Code: OD/348/3324/116655/394484/00061765 (CONST OF CC ROAD FROM RD ROAD TO MURALI PAL HOUSE VIA BASANTI PAL HOUSE UNDER PATULI GP)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhandaripokhari Bill Status: Final Bill
Proposal Date: 07-12-2024 Date of Commencement: 24-10-2025
Date of Completion: 07-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: PRAMOD KUMAR MISHRA
Administrative Approval Details
Approval No.: OD/348/3324/116655/394484/00061765/AS
Technical Sanction Details
Technical Sanction No.: OD/348/3324/116655/394484/00061765/TS
Fund Sanction No.: 28963
Fund Sanction Amount (in Rs.): 143788
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 7.74 Cubic Meter 4.6 35.604 - - 0.68 5.2632
3 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.5 Cubic Meter 0.516 2.322 - - - -
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 32 Square Meter - - 0.05 1.6 0.05 1.6
5 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12 Cubic Meter 0.1236 1.4832 - - - -
Total Qty 39.4092 6.8632 1.6
Rate Per Man Day 462 562 512
Total Amount 18207.0504 3857.1184 819.2
Total Labour Amount (in Rs.): 22883.3688