Labour Statement

State: Odisha District: Kendrapara Block: Rajkanika Gram Panchayat: Baradia
Work Code: OD/360/3441/119206/395617/00061773 (REPAIR AND RESTORATION OF DEULI PRIMARY SCHOOL)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Rajkanika Bill Status: Final Bill
Proposal Date: - Date of Commencement: 29-10-2025
Date of Completion: 14-11-2025 Scheme Name: Severe Cyclonic Storm DANA 2024
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: Sujay Kumar Mandal
Administrative Approval Details
Approval No.: OD/360/3441/119206/395617/00061773/AS
Technical Sanction Details
Technical Sanction No.: OD/360/3441/119206/395617/00061773/TS
Fund Sanction No.: 5574
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled Semi-Skilled Skilled
Rs. 462 Rs. 612 Rs. 512 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Dismantling (AR1612) : Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 85.9594 Square Meter 0.21505376344086 18.485892473118 - - - - - -
2 Flooring (AR0816) : Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 85.9594 Square Meter 0.216 18.5672304 0.55 47.27767 - - 0.216 18.5672304
4 Painting (AR0917hk) : Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work (Outside)(For repair and maintenance). - Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 162.48 Square Meter 0.098698709677419 16.036566348387 - - - - 0.091558709677419 14.876459148387
5 Painting (AR0918bk) : Finishing wall with two coat water proofing cement paint including one coat cement wash on the inner surface of approved shade on old work . (Inside)(For repair and maintenance). - Finishing wall with two coat water proofing cement paint including one coat cement wash on the inner surface of approved shade on old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Inside)(For repair and maintenance). 96.93 Square Meter 0.14231741935484 13.794827458065 - - 0.082258064516129 7.9732741935484 0.02244 2.1751092
Total Qty 66.88451667957 35.618798748387 47.27767 7.9732741935484
Rate Per Man Day 462 612 512 562
Total Amount 30900.646705961 21798.704834013 24206.16704 4480.9800967742
Total Labour Amount (in Rs.): 81386.498676748