Labour Statement

State: Odisha District: Dhenkanal Block: Odapada Gram Panchayat: Kotam
Work Code: OD/352/3355/117401/403337/00062389 (Construction of CC Road of Kottam Village)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Odapada Bill Status: Final Bill
Proposal Date: - Date of Commencement: 02-12-2025
Date of Completion: 11-12-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Bibhuprasan Panda
Administrative Approval Details
Approval No.: OD/352/3355/117401/403337/00062389/AS
Technical Sanction Details
Technical Sanction No.: OD/352/3355/117401/403337/00062389/TS
Fund Sanction No.: 4423
Fund Sanction Amount (in Rs.): 250000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled
Rs. 562 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.271375 Cubic Meter 3.9 79.0583625 0.18 3.6488475
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 16.8928125 Cubic Meter 4.6 77.7069375 0.68 11.4871125
Total Qty 15.13596 156.7653
Rate Per Man Day 562 462
Total Amount 8506.40952 72425.5686
Total Labour Amount (in Rs.): 80931.97812