Labour Statement

State: Odisha District: Nabarangpur Block: Tentulikhunti Gram Panchayat: Tentulikhunti
Work Code: OD/366/3521/120569/428000/00062804 (REPAIR AND MAINTENANCE OF CLASS ROOM AT GPS HATHIPAKHANA)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Tentulikhunti Bill Status: Final Bill
Proposal Date: 25-07-2025 Date of Commencement: 12-11-2025
Date of Completion: 13-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: Elementary School
Project Type: New Work Name of Executant: BRAJABIHARI MAHAKUD
Administrative Approval Details
Approval No.: OD/366/3521/120569/428000/00062804/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3521/120569/428000/00062804/TS
Fund Sanction No.: 28365
Fund Sanction Amount (in Rs.): 100000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled
Rs. 462 Rs. 562 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Plastering (AR1014k) : 16mm thick cement Plaster in CM (1:6) over brick work in inside (inside)(For repair and maintenance) . - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc. comp. and as per direction of Engineer-in-charge(For repair and maintenance). 147.516 Square Meter 0.2448 36.1119168 0.1632 24.0746112 - -
2 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 301.689 Square Meter 0.053763440860215 16.219838709677 - - 0.053763440860215 16.219838709677
3 Painting (AR0922) : Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 74.489 Square Meter 0.062 4.618318 - - 0.052 3.873428
4 Painting (AR0918Ai) : Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 138.738 Square Meter 0.043 5.965734 - - 0.036 4.994568
5 Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 138.738 Square Meter 0.12 16.64856 0.14 19.42332 - -
Total Qty 79.564367509677 43.4979312 25.087834709677
Rate Per Man Day 462 562 612
Total Amount 36758.737789471 24445.8373344 15353.754842323
Total Labour Amount (in Rs.): 76558.329966194