Labour Statement

State: Odisha District: Cuttack Block: Tigiria Gram Panchayat: Bhiruda
Work Code: OD/350/3345/117170/398981/00062833 (Const of Rural Haat at Godijharia, Bhiruda )
Project Category: Other Infrastructure
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Tigiria Bill Status: Final Bill
Proposal Date: 12-11-2021 Date of Commencement: 12-11-2025
Date of Completion: 03-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Development of Rural Haat Project Sub-Category: Rural Haat
Project Type: New Work Name of Executant: Mihir Kumar Sethy
Administrative Approval Details
Approval No.: OD/350/3345/117170/398981/00062833/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3345/117170/398981/00062833/TS
Fund Sanction No.: 19515
Fund Sanction Amount (in Rs.): 1000000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 612 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 45.537945088 Cubic Meter 0.516 23.497579665408 - - - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 101.61653722384 Cubic Meter 0.1236 12.559804000867 - - - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 27.364812148925 Cubic Meter 3.9 106.72276738081 - - 0.18 4.9256661868065 - -
4 Masonry Brick Work (AR0603b) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 36.648994613888 Cubic Meter 2.96 108.48102405711 - - 1.05 38.481444344582 0.35 12.827148114861
5 Flooring (AR0802i) : 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 228.54138 Square Meter 0.36 82.2748968 - - - - 0.13 29.7103794
6 Roofing (AR1132i) : Supplying, feeting & fixing of G.C.I. Sheet (0.40mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.40mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge 243.40586 Square Meter 0.21505376344086 52.345346236559 - - - - 0.16129032258065 39.259009677419
7 Iron Work (AR1703) : Iron work wrought and put up in trusses and record racks - Iron work wrought and put up in trusses and record racks including all cost of labour, material, machinery and T & P required for the work etc. as per direction of Engineer-in-Charge. 16.8 Quintal 4.9212598425197 82.677165354331 1.9685039370079 33.070866141732 4.4291338582677 74.409448818898 - -
Total Qty 468.55858349508 117.81655935029 81.79653719228 33.070866141732
Rate Per Man Day 462 562 612 512
Total Amount 216474.06557473 66212.906354861 50059.480761675 16932.283464567
Total Labour Amount (in Rs.): 349678.73615583