Labour Statement

State: Odisha District: Jajpur Block: Rasulpur Gram Panchayat: Rasulpur
Work Code: OD/356/3402/118483/401530/00063432 (Construction of road from RD road to Kantia padia at Rasulpura)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Rasulpur Bill Status: Final Bill
Proposal Date: - Date of Commencement: 10-11-2025
Date of Completion: 04-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SUNARAM MARNDI
Administrative Approval Details
Approval No.: OD/356/3402/118483/401530/00063432/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3402/118483/401530/00063432/TS
Fund Sanction No.: 29143
Fund Sanction Amount (in Rs.): 294092
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0122Ai) : Earth work in all kinds of soil within 50m, initial lead and 1.5m, initial lift - Earth work in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 4.4025 Cubic Meter 0.473534 2.084733435 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 18.4905 Cubic Meter 0.1236 2.2854258 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 25.828 Cubic Meter 3.9 100.7292 - - 0.18 4.64904
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 14.9685 Cubic Meter 4.6 68.8551 - - 0.68 10.17858
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 67.505 Square Meter - - 0.05 3.37525 0.05 3.37525
Total Qty 173.954459235 18.20287 3.37525
Rate Per Man Day 462 562 512
Total Amount 80366.96016657 10230.01294 1728.128
Total Labour Amount (in Rs.): 92325.10110657