Labour Statement

State: Odisha District: Ganjam Block: Patrapur Gram Panchayat: Patrapur
Work Code: OD/354/3379/117889/413350/00065094 (CONST OF PAVER BLOCK ROAD AT GOUDA SAHI OF PATRAPUR)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Patrapur Bill Status: Final Bill
Proposal Date: - Date of Commencement: 22-11-2025
Date of Completion: 23-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: Pavor Block
Project Type: New Work Name of Executant: SUNIL KUMAR JANI
Administrative Approval Details
Approval No.: OD/354/3379/117889/413350/00065094/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3379/117889/413350/00065094/TS
Fund Sanction No.: 13745
Fund Sanction Amount (in Rs.): 380000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 74.0505 Cubic Meter 0.516 38.210058 - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 44.065 Cubic Meter 0.1236 5.446434 - -
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 0.8496 Cubic Meter 4.6 3.90816 0.68 0.577728
Total Qty 47.564652 0.577728
Rate Per Man Day 462 562
Total Amount 21974.869224 324.683136
Total Labour Amount (in Rs.): 22299.55236