Labour Statement

State: Odisha District: Khordha Block: Tangi Gram Panchayat: Mangalajodi
Work Code: OD/362/3465/275252/408165/00065158 (Construction of CC road from Bimala Temple to Taradevi road of Mangalajodi G.P.)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Tangi Bill Status: Final Bill
Proposal Date: - Date of Commencement: 20-11-2025
Date of Completion: 05-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SUBHASHREE SAMANTARAY
Administrative Approval Details
Approval No.: OD/362/3465/275252/408165/00065158/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3465/275252/408165/00065158/TS
Fund Sanction No.: 8053
Fund Sanction Amount (in Rs.): 400000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled Semi-Skilled
Rs. 562 Rs. 462 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 27.375 Cubic Meter 3.9 106.7625 - - 0.18 4.9275
2 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 273.75 Square Meter 0.01 2.7375 - - - -
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 27.375 Cubic Meter 4.6 125.925 - - 0.68 18.615
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 45 Square Meter - - 0.05 2.25 0.05 2.25
5 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 27.375 Cubic Meter 0.1236 3.38355 - - - -
Total Qty 25.7925 238.80855 2.25
Rate Per Man Day 562 462 512
Total Amount 14495.385 110329.5501 1152
Total Labour Amount (in Rs.): 125976.9351