Labour Statement

State: Odisha District: Balangir Block: Turekela Gram Panchayat: Khagsa
Work Code: OD/345/3297/116039/420885/00065438 (CONST OF CC ROAD AT KHAGSA HARIJANPADA VIA THAKAPADA)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Turekela Bill Status: Final Bill
Proposal Date: - Date of Commencement: 24-11-2025
Date of Completion: 04-12-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: TEJU PUTEL
Administrative Approval Details
Approval No.: OD/345/3297/116039/420885/00065438/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3297/116039/420885/00065438/TS
Fund Sanction No.: 14036
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0122Ai) : Earth work in all kinds of soil within 50m, initial lead and 1.5m, initial lift - Earth work in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 4.2899952 Cubic Meter 0.473534 2.0314585870368 - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.9407146 Cubic Meter 0.1236 1.72307232456 - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 22.691738472 Cubic Meter 3.9 88.4977800408 0.18 4.08451292496
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.3471852544 Cubic Meter 4.6 47.59705217024 0.68 7.036085972992
Total Qty 139.84936312264 11.120598897952
Rate Per Man Day 462 562
Total Amount 64610.405762658 6249.776580649
Total Labour Amount (in Rs.): 70860.182343307