Labour Statement

State: Odisha District: Puri Block: Satyabadi Gram Panchayat: Balarampur
Work Code: OD/369/3546/121086/409654/00066110 (CONST OF ROAD FROM MALASAHI JAGULAI TEMPLE TO CYCLONE SHELTER AT BALARAMPURGARH GP)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Satyabadi Bill Status: Final Bill
Proposal Date: 15-03-2024 Date of Commencement: 26-11-2025
Date of Completion: 19-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: New Work Name of Executant: PRAMATHA TRIPATHY
Administrative Approval Details
Approval No.: OD/369/3546/121086/409654/00066110/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3546/121086/409654/00066110/TS
Fund Sanction No.: 6473
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 8.75206593024 Cubic Meter 0.1236 1.0817553489777 - - - -
2 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.95712773984 Cubic Meter 3.9 66.132798185376 - - 0.18 3.0522829931712
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 12.32928479904 Cubic Meter 4.6 56.714710075584 - - 0.68 8.3839136633472
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 18.023182 Square Meter - - 0.05 0.9011591 0.05 0.9011591
Total Qty 123.92926360994 12.337355756518 0.9011591
Rate Per Man Day 462 562 512
Total Amount 57255.319787791 6933.5939351633 461.3934592
Total Labour Amount (in Rs.): 64650.307182155