Labour Statement

State: Odisha District: Kendujhar Block: Patana Gram Panchayat: Chinamaliposi
Work Code: OD/361/3453/119478/386618/00066182 (Improvement of Road from Mahima Matha to Chaitanya Giri House at Ketang)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Patana Bill Status: Final Bill
Proposal Date: - Date of Commencement: 02-12-2025
Date of Completion: 10-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Sitakanta Beura
Administrative Approval Details
Approval No.: OD/361/3453/119478/386618/00066182/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3453/119478/386618/00066182/TS
Fund Sanction No.: 31391
Fund Sanction Amount (in Rs.): 400000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 5.56095 Cubic Meter 0.516 2.8694502 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 27.471093 Cubic Meter 0.1236 3.3954270948 - - - -
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 36.70227 Cubic Meter 3.9 143.138853 - - 0.18 6.6064086
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.2438 Cubic Meter 4.6 102.32148 - - 0.68 15.125784
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 12.1699 Square Meter - - 0.05 0.608495 0.05 0.608495
Total Qty 251.7252102948 22.3406876 0.608495
Rate Per Man Day 462 562 512
Total Amount 116297.0471562 12555.4664312 311.54944
Total Labour Amount (in Rs.): 129164.0630274