Labour Statement

State: Odisha District: Jajpur Block: Korei Gram Panchayat: Tarakot
Work Code: OD/356/3401/275233/400771/00067294 (Repair and restoration of Tarapada Primary school,Tarapada ,Tarakote)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Korei Bill Status: Final Bill
Proposal Date: - Date of Commencement: 04-12-2025
Date of Completion: 16-12-2025 Scheme Name: Severe Cyclonic Storm DANA 2024
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: Bijay Kumar Nayak
Administrative Approval Details
Approval No.: OD/356/3401/275233/400771/00067294/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3401/275233/400771/00067294/TS
Fund Sanction No.: 6137
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled
Rs. 462 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Dismantling (AR1612) : Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 107.15 Square Meter 0.21505376344086 23.043010752688 - -
2 Other Building Items. (AR1901Ba) : Vitrified Tile 600mmx600mm Coloured /Printed - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Coloured /Printed series(Homogeneous) in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. 117.77 Square Meter 0.216 25.43832 0.216 25.43832
4 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 382.04 Square Meter 0.053763440860215 20.539784946237 0.053763440860215 20.539784946237
5 Painting (AR0918fk) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 382.04 Square Meter 0.06528 24.9395712 0.05508 21.0427632
Total Qty 93.960686898925 67.020868146237
Rate Per Man Day 462 612
Total Amount 43409.837347303 41016.771305497
Total Labour Amount (in Rs.): 84426.6086528