Labour Statement

State: Odisha District: Sundargarh Block: Lephripara Gram Panchayat: Giringkela
Work Code: OD/373/3584/121696/383683/00068478 (Construction of Cement Concrete Road from Prafulla Pradhan House to Mohana Rout House at Jayantipada)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Lephripara Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 12-12-2025
Date of Completion: - Scheme Name: Bikashita Gaon Bikashita Odisha
Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO) Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Radhashyam Das
Administrative Approval Details
Approval No.: OD/373/3584/121696/383683/00068478/AS
Technical Sanction Details
Technical Sanction No.: OD/373/3584/121696/383683/00068478/TS
Fund Sanction No.: 4510
Fund Sanction Amount (in Rs.): 324978
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Semi-Skilled Skilled
Rs. 462 Rs. 512 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 243.6375 Square Meter 0.01 2.436375 - - - -
2 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.505625 Cubic Meter 0.516 2.3249025 - - - -
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 22.861875 Cubic Meter 0.1236 2.82572775 - - - -
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 46.725 Square Meter - - 0.05 2.33625 0.05 2.33625
5 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 23.29575 Cubic Meter 3.9 90.853425 - - 0.18 4.193235
6 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.04315375 Cubic Meter 4.6 92.19850725 - - 0.68 13.62934455
Total Qty 190.6389375 2.33625 20.15882955
Rate Per Man Day 462 512 562
Total Amount 88075.189125 1196.16 11329.2622071
Total Labour Amount (in Rs.): 100600.6113321