Labour Statement

State: Odisha District: Angul Block: Anugul Gram Panchayat: Angarbandha
Work Code: OD/344/3276/115550/404281/00085900 (11:15)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Anugul Bill Status: Final Bill
Proposal Date: - Date of Commencement: 12-03-2026
Date of Completion: 12-03-2026 Scheme Name: MLA LADS
Scheme Component Name: MLA LAD General Project Sub-Category: CC Road
Project Type: New Work Name of Executant: MAHASWATA DAS
Administrative Approval Details
Approval No.: OD/344/3276/115550/404281/00085900/AS
Technical Sanction Details
Technical Sanction No.: OD/344/3276/115550/404281/00085900/TS
Fund Sanction No.: 43434
Fund Sanction Amount (in Rs.): 800000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0103a1) : Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m to 75m lead and 1.5m - Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the dept. 360 Cubic Meter 0.7006 252.216 - - - -
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 105.338496 Cubic Meter 3.9 410.8201344 - - 0.18 18.96092928
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 360 Square Meter - - 0.05 18 0.05 18
Total Qty 663.0361344 36.96092928 18
Rate Per Man Day 462 562 512
Total Amount 306322.6940928 20772.04225536 9216
Total Labour Amount (in Rs.): 336310.73634816