Material Statement

State: Odisha District: Khordha Block: Bhubaneswar Gram Panchayat: Tikarapada
Work Code: OD/362/3460/119616/407756/00013204 (Imp. of CC road from Tikarpada Laxman Rout house to Danda Road)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhubaneswar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 22-05-2025
Date of Completion: 22-05-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: test
Administrative Approval Details
Approval No.: OD/362/3460/119616/407756/00013204/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3460/119616/407756/00013204/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 204220
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 16.091304768 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 16.091304768 Cum 1 16.091304768 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.091304768 Cum - - 2.29 36.84908791872 0.48 7.72382628864 0.96 15.44765257728 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 12.434190048 Cum - - 3.23 40.16243385504 0.45 5.5953855216 - - 0.9 11.1907710432 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 17.67386672 Sqm - - - - - - - - - - 0.00267 0.0471892241424 0.126 2.22690720672
Total Qty 16.091304768 77.01152177376 13.31921181024 15.44765257728 11.1907710432 0.0471892241424 2.22690720672
Rate Per Unit 397.3 569.387 403.69 1792.06 2169.52 58573.086 229.106
Total Amount 6393.0753843264 43849.359348196 5376.8326156758 27683.12027764 24278.601593643 2764.0184839661 510.19780250279
Total Material Amount (in Rs.): 110855.20550595