Material Statement

State: Odisha District: Gajapati Block: Gosani Gram Panchayat: Tatipetti
Work Code: OD/353/3357/117456/414692/00013354 (Renovation of Crematorium at Tatipetti)
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Gosani Bill Status: Final Bill
Proposal Date: 22-11-2022 Date of Commencement: 02-06-2025
Date of Completion: 04-02-2026 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance of Capital Assets Project Sub-Category: GP Facility Centre
Project Type: Renovation or Rejuvenation Name of Executant: ACHYUTANANDA MUDULI
Administrative Approval Details
Approval No.: OD/353/3357/117456/414692/00013354/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3357/117456/414692/00013354/TS
Fund Sanction No.: 22575
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0122Aia) :.Earthwork in all kinds of soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in all kinds of soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge 127.25775 Cum - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 11.8125 Cum 1 11.8125 - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 37.8 Cum - - 2.29 86.562 0.48 18.144 0.96 36.288 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 126 Sqm - - - - - - - - 0.00267 0.33642 0.126 15.876
Total Qty 11.8125 86.562 18.144 36.288 0.33642 15.876
Rate Per Unit 738.55 618.427 743.49 1466.56 58763.326 419.346
Total Amount 8724.121875 53532.277974 13489.88256 53218.52928 19769.15813292 6657.537096
Total Material Amount (in Rs.): 155391.50691792