Material Statement

State: Odisha District: Malkangiri Block: Malkangiri Gram Panchayat: Matapaka
Work Code: OD/364/3484/119972/430280/00013434 (Construction of Market Complex at Matapaka)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Malkangiri Bill Status: Final Bill
Proposal Date: 19-02-2024 Date of Commencement: 10-12-2024
Date of Completion: 30-12-2024 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Creation of Capital Asset for Revenue Generation Project Sub-Category: Market Complex
Project Type: New Work Name of Executant: TAPAN KUMAR SAMAL
Administrative Approval Details
Approval No.: OD/364/3484/119972/430280/00013434/AS
Technical Sanction Details
Technical Sanction No.: OD/364/3484/119972/430280/00013434/TS
Fund Sanction No.: 12821
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM162 BRM341 BRMMR0025 BRM001 BRM057 BRM142 BRM253 BRM060 BRM052 BRM084 BRM104
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0122Ai1) :.Earthwork in all kinds of soil within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth - Earthwork in all kinds of soil within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 16.77 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 21.796 Cum 2.29 49.91284 0.48 10.46208 0.96 20.92416 - - - - - - - - - - - - - - - - - - - - - -
3 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 25 Qntl - - - - - - 0.8 20 1.05 26.25 - - - - - - - - - - - - - - - - - -
4 Masonry Brick Work (AR0603di) :.C.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure - Brickwork with C.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 0 Cum 1 0 0.28 0 - - - - - - 1 0 350 0 - - - - - - - - - - - - - -
5 Flooring (AR0802ii) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 26 Sqm 0.0858 2.2308 0.012 0.312 - - - - - - - - - - 0.023 0.598 - - - - - - - - - - - -
6 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 43.2 Sqm 0.043 1.8576 0.018 0.7776 - - - - - - - - - - - - - - - - - - - - - - - -
7 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 128.0125 Sqm 0.0358 4.5828475 0.015 1.9201875 - - - - - - - - - - - - - - - - - - - - - - - -
8 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 199 Sqm - - - - - - - - - - - - - - - - 0.25 49.75 - - - - - - - - - -
9 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 199 Sqm - - - - - - - - - - - - - - - - - - 0.084 16.716 - - - - - - - -
10 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 5.9 Qntl - - - - - - - - 1 5.9 - - - - - - - - - - - - - - - - - -
11 R.C.C. Work (AR0405Ac) :.Reinforced cement concrete work of M-25 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-25 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work, etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 28.81845 Cum 4.03333 116.2343189385 0.45 12.9683025 - - - - - - - - - - - - - - - - 0.36 10.374642 0.54 15.561963 4.4196 127.36602162 0.041529 1.19680141005
Total Qty 174.8184064385 26.44017 20.92416 20 32.15 0 0 0.598 49.75 16.716 10.374642 15.561963 127.36602162 1.19680141005
Rate Per Unit 687.872 613.29 1596.76 90.1 6470.192 33 5.832435 1686.7 70.64512 159.57512 2020.18 1983.8 297.726 58620.646
Total Amount 120252.68687366 16215.4918593 33410.8617216 1802 208016.6728 0 0 1008.6466 3514.59472 2667.45770592 20958.64427556 30871.8221994 37920.176152836 70157.271790842
Total Material Amount (in Rs.): 546796.32669912