Material Statement

State: Odisha District: Nabarangpur Block: Nabarangpur Gram Panchayat: Basini
Work Code: OD/366/3517/120490/427816/00013548 (Const.of CC Road at Dumarmunda Dharani sahi)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Nabarangpur Bill Status: Final Bill
Proposal Date: 25-06-2023 Date of Commencement: 03-12-2024
Date of Completion: 26-03-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SK MURSHID
Administrative Approval Details
Approval No.: OD/366/3517/120490/427816/00013548/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3517/120490/427816/00013548/TS
Fund Sanction No.: 13737
Fund Sanction Amount (in Rs.): 143788
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 18.63 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12.42 Cum 1 12.42 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.42 Cum - - 2.29 28.4418 0.48 5.9616 0.96 11.9232 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 13.8 Sqm - - - - - - - - 0.00267 0.036846 0.126 1.7388 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 8.694 Cum - - 3.23 28.08162 0.45 3.9123 - - - - - - 0.9 7.8246
Total Qty 12.42 56.52342 9.8739 11.9232 0.036846 1.7388 7.8246
Rate Per Unit 413.05 552.612 417.24 1336.36 58620.646 276.666 1737.73
Total Amount 5130.081 31235.52017304 4119.786036 15933.687552 2159.936322516 481.0668408 13597.042158
Total Material Amount (in Rs.): 72657.120082356