Material Statement

State: Odisha District: Puri Block: Sadar Gram Panchayat: Ganganarayanpur
Work Code: OD/369/3545/275344/409735/00013580 (Imp of road from Barabodia Bhagabat Ghar to Mohanty Sahi Ganganarayanpur GP)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Sadar Bill Status: Final Bill
Proposal Date: 15-07-2021 Date of Commencement: 19-08-2025
Date of Completion: 29-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Tapabanta Sahoo
Administrative Approval Details
Approval No.: OD/369/3545/275344/409735/00013580/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3545/275344/409735/00013580/TS
Fund Sanction No.: 11088
Fund Sanction Amount (in Rs.): 100000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 6.6 Cum 2.29 15.114 0.48 3.168 0.96 6.336 - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 6.6 Cum 3.23 21.318 0.45 2.97 - - 0.9 5.94 - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 6.6 Cum - - - - - - - - 1 6.6
Total Qty 36.432 6.138 6.336 5.94 6.6
Rate Per Unit 596.333 715.57 1938.91 2350.53 518.79
Total Amount 21725.603856 4392.16866 12284.93376 13962.1482 3424.014
Total Material Amount (in Rs.): 55788.868476