Material Statement

State: Odisha District: Kendujhar Block: Kendujhar Sadar Gram Panchayat: Kaunrikala
Work Code: OD/361/3452/119458/386003/00013835 (Improvement of road from PMJSY to Naik Sahi)
Project Category: Road
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Kendujhar Sadar Bill Status: Final Bill
Proposal Date: 27-10-2021 Date of Commencement: 25-06-2025
Date of Completion: 11-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: Samir Kabi
Administrative Approval Details
Approval No.: OD/361/3452/119458/386003/00013835/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3452/119458/386003/00013835/TS
Fund Sanction No.: 310
Fund Sanction Amount (in Rs.): 492600
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 7.332918528 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 29.893581357401 Cum 1 29.893581357401 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 42.750541227135 Cum - - 2.29 97.898739410139 0.48 20.520259789025 0.96 41.04051957805 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.97625152 Cum - - 3.23 74.2132924096 0.45 10.339313184 - - 0.9 20.678626368 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 80.58034608 Sqm - - - - - - - - - - 0.00267 0.2151495240336 0.126 10.15312360608
Total Qty 29.893581357401 172.11203181974 30.859572973025 41.04051957805 20.678626368 0.2151495240336 10.15312360608
Rate Per Unit 944.51 597.063 954.51 1674.88 2049.63 58573.086 229.106
Total Amount 28234.786527879 102761.72605439 29455.770998482 68737.945430884 42383.532962644 12601.971574079 2326.1415368946
Total Material Amount (in Rs.): 286501.87508525