Material Statement

State: Odisha District: Bargarh Block: Bargarh Gram Panchayat: Nileswar
Work Code: OD/347/3312/116388/380631/00013934 (IMP. OF ROAD FROM BHALUGAD TO BAGDIA)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Bargarh Bill Status: Final Bill
Proposal Date: 19-07-2022 Date of Commencement: 06-11-2025
Date of Completion: 29-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: SUSHMITA TIRKEY
Administrative Approval Details
Approval No.: OD/347/3312/116388/380631/00013934/AS
Technical Sanction Details
Technical Sanction No.: OD/347/3312/116388/380631/00013934/TS
Fund Sanction No.: 29157
Fund Sanction Amount (in Rs.): 400000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 7.56 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 30.353661 Cum 1 30.353661 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 34.349328 Cum - - 2.29 78.65996112 0.48 16.48767744 0.96 32.97535488 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 27.168996 Cum - - 3.23 87.75585708 0.45 12.2260482 - - 0.9 24.4520964 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 37.8 Sqm - - - - - - - - - - 0.00267 0.100926 0.126 4.7628
Total Qty 30.353661 166.4158182 28.71372564 32.97535488 24.4520964 0.100926 4.7628
Rate Per Unit 401.41 567.292 409.04 1354.39 1802.83 58620.646 276.666
Total Amount 12184.26306201 94406.362338314 11745.062335786 44661.490895923 44082.972952812 5916.347318196 1317.7048248
Total Material Amount (in Rs.): 214314.20372784