Material Statement

State: Odisha District: Jharsuguda Block: Jharsuguda Gram Panchayat: Marakuta
Work Code: OD/357/3404/118527/381116/00014136 (Const.. Of Culvert on Old Gp Office house to Samlei Bar Road)
Project Category: Road
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Jharsuguda Bill Status: Final Bill
Proposal Date: 02-11-2023 Date of Commencement: 22-07-2025
Date of Completion: 02-02-2026 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Rajesh Kumar Singh
Administrative Approval Details
Approval No.: OD/357/3404/118527/381116/00014136/AS
Technical Sanction Details
Technical Sanction No.: OD/357/3404/118527/381116/00014136/TS
Fund Sanction No.: 1111
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM057 BRM104 BRM092 BRM084 BRM025 BRM162 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 38.98090688 Cum - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.71224544 Cum 1 10.71224544 - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.805344048 Cum - - 2.29 47.64423786992 0.48 9.98656514304 0.96 19.97313028608 - - - - - - - - - - - - - -
4 Concrete (AR0307a) :.Cement concrete (1:2:4)with 12mm size hard granite(Hand broken)chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(hand broken) chips including hoisting and laying in position compacting to proper thickness and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.651930656 Cum - - 3.23 34.40573601888 0.45 4.7933687952 - - 0.9 9.5867375904 - - - - - - - - - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 61.23979954 Sqm - - - - - - - - - - 0.00267 0.1635102647718 0.126 7.71621474204 - - - - - - - -
6 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 10.01680146 Sqm - - - - - - - - - - 0.0050222222222222 0.050306602888 - - 0.62222222222222 6.232676464 - - - - - -
7 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 29.18826454 Sqm - - 0.043 1.25509537522 0.018 0.52538876172 - - - - - - - - - - - - - - - -
8 Road Work (AR1307) :.Supplying & spreading moorum and consolidation with HRR - Supplying & spreading moorum and consolidation with HRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 15.57424 Cum - - - - - - - - - - - - - - - - 1.28 19.9350272 - - - -
9 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 2.71 Qntl - - - - - - - - - - - - - - - - - - 0.8 2.168 1.05 2.8455
Total Qty 10.71224544 83.30506926402 15.30532269996 19.97313028608 9.5867375904 0.2138168676598 7.71621474204 6.232676464 19.9350272 2.168 2.8455
Rate Per Unit 472.21 564.582 480.21 1661.86 1751.8 58620.646 276.666 297.726 406.99 90.1 6543.652
Total Amount 5058.4294192224 47032.542615219 7349.7690137478 33192.546297225 16794.046910863 12534.082907914 2134.8142678212 1855.6298329209 8113.356720128 195.3368 18619.961766
Total Material Amount (in Rs.): 152880.51655106