Material Statement

State: Odisha District: Ganjam Block: Bhanjanagar Gram Panchayat: Dadaralunda
Work Code: OD/354/3367/117638/410539/00017535 (REPAIR AND MAINTENANCE OF PS AT G RAMBHA)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhanjanagar Bill Status: Final Bill
Proposal Date: 17-05-2023 Date of Commencement: 21-08-2025
Date of Completion: 05-09-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: RABINDRANATH NAIK
Administrative Approval Details
Approval No.: OD/354/3367/117638/410539/00017535/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3367/117638/410539/00017535/TS
Fund Sanction No.: 10574
Fund Sanction Amount (in Rs.): 250000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM143 BRM340 BRMMR0038 BRM028 BRM056 BRM174 BRM131 BRMMR0027 BRM138 BRM142
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0918c) :.Finishing wall with two coat water proofing cement paint including one coat cement wash on the outer surface of approved shade on new work (Outside) - Finishing wall with two coat water proofing cement paint including one coat cement wash on the outer surface of approved shade on new work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 201.7716 Sqm 0.25 50.4429 0.010763440860215 2.171756683871 - - - - - - - - - - - - - - - -
2 Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 241.4564 Sqm - - - - 0.8 193.16512 - - - - - - - - - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 5.19477 Cum - - 3.23 16.7791071 - - 0.45 2.3376465 0.9 4.675293 - - - - - - - - - -
4 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 103.8954 Sqm - - 0.1074 11.15836596 - - 0.021 2.1818034 - - 0.0076 0.78960504 1 103.8954 - - - - - -
5 Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 12.108 Sqm - - 0.1375 1.66485 - - 0.015 0.18162 - - - - 1 12.108 1 12.108 - - - -
6 Painting(AR0901ak) :.Priming one coat in inner surface with primer of approved quality over woodwork(For repair and maintenance). - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge(For repair and maintenance). 547.12 Sqm - - - - - - - - - - - - - - - - 0.075 41.034 - -
7 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 201.77 Sqm - - - - - - - - - - - - - - - - - - 0.25 50.4425
Total Qty 50.4429 31.774079743871 193.16512 4.7010699 4.675293 0.78960504 116.0034 12.108 41.034 50.4425
Rate Per Unit 48.19677 599.177 30 472.44 1802.83 2053.857 663.9538891 8.5 155.44677 70.46677
Total Amount 2431.184849433 19038.297778693 5794.9536 2220.973463556 8428.75847919 1621.7358386393 77020.908578823 102.918 6378.60276018 3554.520045725
Total Material Amount (in Rs.): 126592.85339424