Material Statement

State: Odisha District: Mayurbhanj Block: Saraskana Gram Panchayat: Pokharia
Work Code: OD/365/3507/120351/387851/00017551 (Construction of CC Road from Dandu house to Sakla house at Khodipahadi in Pokharia GP)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Saraskana Bill Status: Final Bill
Proposal Date: 29-03-2025 Date of Commencement: 28-07-2025
Date of Completion: 26-08-2025 Scheme Name: Chief Minister Special Assistant
Scheme Component Name: Special Problem Fund (SPF) 16 th Phase Project Sub-Category: CC Road
Project Type: New Work Name of Executant: JAYANTA KUMAR BAG
Administrative Approval Details
Approval No.: OD/365/3507/120351/387851/00017551/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3507/120351/387851/00017551/TS
Fund Sanction No.: 3449
Fund Sanction Amount (in Rs.): 400000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 24.9 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 20.4 Cum 1 20.4 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 26.4 Cum - - 2.29 60.456 0.48 12.672 0.96 25.344 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 21.9 Cum - - 3.23 70.737 0.45 9.855 - - 0.9 19.71 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 30 Sqm - - - - - - - - - - 0.00267 0.0801 0.126 3.78
Total Qty 20.4 131.193 22.527 25.344 19.71 0.0801 3.78
Rate Per Unit 596.84 644.787 603.26 1726.96 2128.33 58573.086 229.106
Total Amount 12175.536 84591.540891 13589.63802 43768.07424 41949.3843 4691.7041886 866.02068
Total Material Amount (in Rs.): 201631.8983196