Material Statement

State: Odisha District: Khordha Block: Bhubaneswar Gram Panchayat: Dadha
Work Code: OD/362/3460/119602/407513/00017647 (Construction of cc Road from Marichia Bhagabat Ghara to Transformer, Dadha GP)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhubaneswar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 20-05-2025
Date of Completion: 28-05-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Suchismita Mohanty
Administrative Approval Details
Approval No.: OD/362/3460/119602/407513/00017647/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3460/119602/407513/00017647/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 175000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM079
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.086969 Cum 1 10.086969 - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 13.45614336 Cum - - 2.29 30.8145682944 0.48 6.4589488128 0.96 12.9178976256 - - - -
3 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.3489 Cum - - - - - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.27574976 Cum - - 3.23 36.4206717248 0.45 5.074087392 - - 0.9 10.148174784 - -
5 Masonry Stone Work (AR0717) :.Laterite stone masonry - Laterite stone masonry in cement mortar (1:6) in foundation and plinth cost conveyance, royalty, taxes of all materials, labor, required for the work, etc. complete and as per direction of the Engineer-in-charge. 1.233479808 Cum - - 0.572 0.705550450176 0.24 0.29603515392 - - - - 1 1.233479808
Total Qty 10.086969 67.940790469376 11.82907135872 12.9178976256 10.148174784 1.233479808
Rate Per Unit 397.3 569.387 403.69 1792.06 2169.52 729.98
Total Amount 4007.5527837 38684.602862987 4775.2778168017 23149.647618933 22016.668157384 900.41559024384
Total Material Amount (in Rs.): 93534.164830049