Material Statement

State: Odisha District: Kalahandi Block: Narala Gram Panchayat: Rupra Road
Work Code: OD/358/3420/118842/422759/00020255 (Provision Of Facility Centre At Rupra Road GP Office)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Narala Bill Status: Final Bill
Proposal Date: - Date of Commencement: 18-09-2025
Date of Completion: 31-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Provision of Facilities at GP Head Quarter Project Sub-Category: GP Facility Centre
Project Type: New Work Name of Executant: SANJUKTA PANI
Administrative Approval Details
Approval No.: OD/358/3420/118842/422759/00020255/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3420/118842/422759/00020255/TS
Fund Sanction No.: 12438
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRMMR0027 BRM130 BRM129 BRM140 BRM141 BRM255 BRM341 BRM044 BRM029 BRM005 BRM131 BRM162 BRM060 BRM052
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 141.6775 Sqm 0.0358 5.0720545 0.015 2.1251625 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 187.8875 Sqm 0.043 8.0791625 0.018 3.381975 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Flooring (AR0816) :.Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 21.58625 Sqm 0.2737 5.908156625 0.013 0.28062125 1 21.58625 1 21.58625 - - - - - - - - - - - - - - - - - - - - - - - -
4 Flooring (AR0817b) :.Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. 51.008 Sqm 0.1375 7.0136 0.015 0.76512 - - - - 1 51.008 - - - - - - - - - - - - - - - - - - - - - -
5 Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 154.333 Sqm - - - - - - - - - - 0.075 11.574975 - - - - - - - - - - - - - - - - - - - -
6 Painting(AR0902) :.Painting one coat of enamel on new wood work in inner surface - Painting one coat of enamel on new wood work in inner surface including all costs of labour, Paint, Primer and brushes required for the work etc. complete and as per direction of Engineer-in-charge. 19.36125 Sqm - - - - - - - - - - - - 0.075 1.45209375 - - - - - - - - - - - - - - - - - -
7 Painting(AR0918Ai) :.Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 134.1315 Sqm - - - - - - - - - - - - - - 0.075 10.0598625 - - - - - - - - - - - - - - - -
8 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 2.205 Qntl - - - - - - - - - - - - - - - - 1 2.205 - - - - - - - - - - - - - -
9 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 1.471125 Cum 2.29 3.36887625 0.48 0.70614 - - - - - - - - - - - - - - 0.96 1.41228 - - - - - - - - - - - -
10 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.9685 Cum - - - - - - - - - - - - - - - - - - - - 1 1.9685 - - - - - - - - - -
11 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 22.9905 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
12 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 8.09575 Cum 0.672 5.440344 0.28 2.26681 - - - - - - - - - - - - - - - - - - 350 2833.5125 - - - - - - - -
13 Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 2.95 Sqm 0.1375 0.405625 0.015 0.04425 1 2.95 - - - - - - - - - - - - - - - - - - 1 2.95 - - - - - -
14 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 1.2356 Qntl - - - - - - - - - - - - - - - - 1.05 1.29738 - - - - - - - - 0.8 0.98848 - - - -
15 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 0.9 Cum 3.4733 3.12597 0.45 0.405 - - - - - - - - - - - - - - - - - - - - - - - - 0.36 0.324 0.54 0.486
Total Qty 38.413788875 9.97507875 24.53625 21.58625 51.008 11.574975 1.45209375 10.0598625 3.50238 1.41228 1.9685 2833.5125 2.95 0.98848 0.324 0.486
Rate Per Unit 634.937 678.39 8.5 459.6811111 414.8011111 249.58787 205.64732 189.74787 5314.687 1531.66 413.05 6.30115 660.6811111 90.1 1931.41 1916.41
Total Amount 24390.335866926 6766.9936732125 208.558125 9922.7913844824 21158.175074989 2888.9733555533 298.61918807625 1908.8374818679 18614.05345506 2163.1327848 813.088925 17854.387289375 1949.009277745 89.062048 625.77684 931.37526
Total Material Amount (in Rs.): 110583.17003009