Material Statement

State: Odisha District: Bhadrak Block: Tihidi Gram Panchayat: Sindol
Work Code: OD/348/3328/116771/395179/00028442 (Maintenance Of Cc Road From R.D Road To Sindola Harnabi Bada Gohiri Bridge)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Tihidi Bill Status: Final Bill
Proposal Date: - Date of Commencement: 24-07-2025
Date of Completion: 28-07-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: LALATENDU PAL
Administrative Approval Details
Approval No.: OD/348/3328/116771/395179/00028442/AS
Technical Sanction Details
Technical Sanction No.: OD/348/3328/116771/395179/00028442/TS
Fund Sanction No.: 29781
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 6.39 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 22.2125 Cum 1 22.2125 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 23.049375 Cum - - 2.29 52.78306875 0.48 11.0637 0.96 22.1274 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 13.3275 Cum - - 3.23 43.047825 0.45 5.997375 - - 0.9 11.99475 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 47.57 Sqm - - - - - - - - - - 0.00267 0.1270119 0.126 5.99382
Total Qty 22.2125 95.83089375 17.061075 22.1274 11.99475 0.1270119 5.99382
Rate Per Unit 1074.81 538.927 1077.56 2271.16 2672.53 58573.086 229.106
Total Amount 23874.217125 51645.856076006 18384.331977 50254.865784 32056.3292175 7439.4789417234 1373.22012492
Total Material Amount (in Rs.): 185028.29924615