Material Statement

State: Odisha District: Bhadrak Block: Bhadrak Gram Panchayat: Kaupur
Work Code: OD/348/3323/116634/394746/00028961 (Construction Of C.C. Road At Harekrushna Jena House To Anu Jena House Under Kaupur GP)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhadrak Bill Status: Final Bill
Proposal Date: - Date of Commencement: 30-06-2025
Date of Completion: 27-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: PEO KAUPUR GP
Administrative Approval Details
Approval No.: OD/348/3323/116634/394746/00028961/AS
Technical Sanction Details
Technical Sanction No.: OD/348/3323/116634/394746/00028961/TS
Fund Sanction No.: 12804
Fund Sanction Amount (in Rs.): 143788
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM057 BRM340 BRM028 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102c) :.Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift and Compaction H.R.R - Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the Department alongwith proper compaction with H.R.R. (section measurement to be taken on the finished compacted section of the fill) as per direction of Engineer-in-Charge. 4.185 Cum - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 11.8668 Cum 1 11.8668 - - - - - - - - - -
3 Concrete (AR0309a) :.Cement Concrete (1:3:6) with 12mm size hard broken granite Hand Broken chips - Cement Concrete (1:3:6) with 12mm size hard granite (Hand Broken) chips including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 9.13632 Cum - - 0.9 8.222688 2.15 19.643088 0.45 4.111344 - - - -
4 Concrete (AR0307a) :.Cement concrete (1:2:4)with 12mm size hard granite(Hand broken)chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(hand broken) chips including hoisting and laying in position compacting to proper thickness and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 6.62532 Cum - - 0.9 5.962788 3.23 21.3997836 0.45 2.981394 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 28.0303958704 Sqm - - - - - - - - 0.00267 0.074841156973968 0.126 3.5318298796704
Total Qty 11.8668 14.185476 41.0428716 7.092738 0.074841156973968 3.5318298796704
Rate Per Unit 907.81 2191.01 544.872 912.75 58620.646 276.666
Total Amount 10772.799708 31080.51977076 22363.111534435 6473.8966095 4387.2369692014 977.13724548889
Total Material Amount (in Rs.): 76054.701837386