Material Statement

State: Odisha District: Cuttack Block: Badamba Gram Panchayat: Karadibandha
Work Code: OD/350/3333/116883/398801/00030291 (Const. Of Cc Road From State Bank To School)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Badamba Bill Status: Final Bill
Proposal Date: - Date of Commencement: 19-11-2025
Date of Completion: 25-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SURYAKANTA SENAPATY
Administrative Approval Details
Approval No.: OD/350/3333/116883/398801/00030291/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3333/116883/398801/00030291/TS
Fund Sanction No.: 15598
Fund Sanction Amount (in Rs.): 263944
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 33.732 Cum 3.23 108.95436 0.45 15.1794 0.9 30.3588 - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 16.2 Sqm - - - - - - 0.00267 0.043254 0.126 2.0412
Total Qty 108.95436 15.1794 30.3588 0.043254 2.0412
Rate Per Unit 575.657 548.19 2041.61 58573.086 229.106
Total Amount 62720.34001452 8321.195286 61980.829668 2533.520261844 467.6511672
Total Material Amount (in Rs.): 136023.53639756