Material Statement

State: Odisha District: Nabarangpur Block: Umerkote Gram Panchayat: Murtumma
Work Code: OD/366/3522/120583/427332/00034296 (Improvement of Rural Park at Murtuma)
Project Category: Other Infrastructure
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Umerkote Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 16-09-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Innovative Practices Project Sub-Category: Rural Park
Project Type: Upgradation or Improvement Name of Executant: SAMRAT PRASAN DAS
Administrative Approval Details
Approval No.: OD/366/3522/120583/427332/00034296/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3522/120583/427332/00034296/TS
Fund Sanction No.: 6833
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM056 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 44.4 Cum 1 44.4 - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 33.3 Cum - - 3.23 107.559 0.45 14.985 0.9 29.97 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 49.2 Cum - - 2.29 112.668 0.48 23.616 - - 0.96 47.232
4 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 93.6 Cum - - - - - - - - - -
Total Qty 44.4 220.227 38.601 29.97 47.232
Rate Per Unit 673.45 575.605 677.64 2043.7 1642.33
Total Amount 29901.18 126763.762335 26157.58164 61249.689 77570.53056
Total Material Amount (in Rs.): 321642.743535