Material Statement

State: Odisha District: Kandhamal Block: Phulbani Gram Panchayat: Dadaki
Work Code: OD/359/3430/118979/415431/00039332 (Improvement Of Road From Benakera Chhaka To Benakera School)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Phulbani Bill Status: Final Bill
Proposal Date: - Date of Commencement: 14-08-2025
Date of Completion: 29-08-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: SANTOSHI SAHOO
Administrative Approval Details
Approval No.: OD/359/3430/118979/415431/00039332/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3430/118979/415431/00039332/TS
Fund Sanction No.: 15598
Fund Sanction Amount (in Rs.): 281668
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 28.8406608 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 2.0600472 Cum 1 2.0600472 - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 42.7459794 Cum - - 2.29 97.888292826 0.48 20.518070112 0.96 41.036140224 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 0.659215104 Cum - - 3.23 2.12926478592 0.45 0.2966467968 - - 0.9 0.5932935936 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 115.257784375 Sqm - - - - - - - - - - 0.00267 0.30773828428125 0.126 14.52248083125
Total Qty 2.0600472 100.01755761192 20.8147169088 41.036140224 0.5932935936 0.30773828428125 14.52248083125
Rate Per Unit 411.11 569.477 417.99 1453.97 2626.53 58573.086 229.106
Total Amount 846.906004392 56957.698656163 8700.3435207093 59665.316801489 1558.3034223982 18025.180990698 3327.1874933244
Total Material Amount (in Rs.): 149080.93688917