Material Statement

State: Odisha District: Bhadrak Block: Chandabali Gram Panchayat: Orasahi
Work Code: OD/348/3326/116711/395410/00042302 (Improvement of connectivity At U.G.High School Premises)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Chandabali Bill Status: Final Bill
Proposal Date: - Date of Commencement: 10-12-2025
Date of Completion: 18-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: JADU TUDU
Administrative Approval Details
Approval No.: OD/348/3326/116711/395410/00042302/AS
Technical Sanction Details
Technical Sanction No.: OD/348/3326/116711/395410/00042302/TS
Fund Sanction No.: 30256
Fund Sanction Amount (in Rs.): 250000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.3 Cum 2.29 23.587 0.48 4.944 0.96 9.888 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 7 Sqm - - - - - - 0.00267 0.01869 0.126 0.882 - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 21.4 Cum 3.23 69.122 0.45 9.63 - - - - - - 0.9 19.26
Total Qty 92.709 14.574 9.888 0.01869 0.882 19.26
Rate Per Unit 574.812 1252.36 2455.16 58620.646 276.666 2856.53
Total Amount 53290.245708 18251.89464 24276.62208 1095.61987374 244.019412 55016.7678
Total Material Amount (in Rs.): 152175.16951374